Post Offer Free
Center Enamel Co.,Ltd  

Gold Index: 7030

You are here: home  > Green EGSB Reactor Waste Water Storage Tanks Corrosion Resistance

Green EGSB Reactor Waste Water Storage Tanks Corrosion Resistance 

Place of Origin: Guangdong, China (Mainland) 
inquire
Add to My Favorites
HiSupplier Escrow
Share |

Product Detail

Model No.: AIA-1

Cost Effective Green Color EGSB Reactor Waste Water Storage Tanks Good Corrosion Resistance
 
 
<

Cost Effective Green Color EGSB Reactor Waste Water Storage Tanks Good Corrosion Resistance

 

 

Brief introduction

Center Enamel has been committed to glass fused to steel tank for more than 20 years . We adopt  advanced glass fusing technology to make quality tanks . Time has witnessed that in wastewater treatment industry , glass fused to steel tank is with good performance . Panels are baked at a high temperature which melts the silica glass slip into the surface of the grit blasted steel . Surface of the tanks are well treated , so it will not rust when exposed in harsh environment

 

Feature

Panels are flexible and with high cohesion strength

Adherence   3,450 N/cm

Hardness   6.0 Mohs

Holiday test >1500v

Service life ≥30 years

Acid and alkalinity proof  Standard sheet  PH:3~11   Special   sheet  PH : 1~14

 

About EGSB Reactor

EGSB Is a perfect combination of anaerobic fluidized bed with UASB . The distinguishing feature is that a faster rate of upward-flow velocity is designed for the wastewater passing through the sludge bed . The difference of EGSB from UASB process is operation capability in higher loadings and accordingly the reactor of EGSB is taller and slender .  During the primeval fluidization in the EGSB reactor ,  the expansion phase  ( Volume expansion rate is about 10%~30% ), the velocity of the water flow is very high  . The increased flow velocity is either accomplished by utilizing tall reactors, or by incorporating an effluent recycle (or both) .The increased flux permits partial expansion (fluidization) of the granular sludge bed, improving wastewater-sludge contact as well as enhancing segregation of small inactive suspended particle from the sludge bed .

 

Reference project

projects description

Pharmaceutical wastewate treatment

   --  Chengdu city ,Sichuan province , China in 2013

Ø19.86×4.8M , 1 set of aerobic tank

Ø13.73×7.2M , 1 set of anaerobic  tank

Ø11.46×6M , 1 set of buffer tank

Brewery wastewater treatment

                             - Cambodia  Phnom Penh

daily waste water treatment : 1000 T

1 set of UASB tank Ø8.4×16.8M

1 set of Contact Oxidation tank Ø10.70×4.8 M, 2 sets of adjusting tank Ø9.93×4.8 M  ,

1 set of secondary sedimentation tank

Ø7.64×4.8 M

Beijing Olympic Games sewage treatment system

4 sets  of  enamel tank  Ø18.33×3.6M ,1  set of  enamel tank  Ø4.82×3.6M

Total volume  5200m3,installation : 12  people ,18 days

Mining waste water Shanxi province,China

1 set of  hydrolyzation tank  Ø16.81×4.8 M
1 set of secondary sedimentation tank: Ø18.33×3.6 M
1 set of sedimentation tank :  Ø7.64×4.8 M
2 sets of  biological aerated filter : Ø6.11×6 M
installation: 10  person 18 days

Brewery wastewater treatment

2 sets of EGSB  reactor  Ø5.35×16.8M

 

Details

 

bigPhoto
 Mr. melody wong

Tel: 86-20-34061629
Contact to this supplier

Related Search

Find more related products in following catalogs on Hisupplier.com

Company Info

Center Enamel Co.,Ltd [China (Mainland)]


Business Type:Manufacturer
City: Guangzhou
Province/State: Guangdong
Country/Region: China (Mainland)

You May Like:

Product (149)