Post Offer Free
Center Enamel Co.,Ltd  

Gold Index: 7030

You are here: home  > Dark green Bolted Steel Tanks for Digester and Bioenergy Process

Dark green Bolted Steel Tanks for Digester and Bioenergy Process 

Place of Origin: Guangdong, China (Mainland) 
inquire
Add to My Favorites
HiSupplier Escrow
Share |

Product Detail

Model No.: AIA-1

Minimum Assembly Time Bolted Steel Tanks for Digester and Bioenergy Process
 
 
Brief

Minimum Assembly Time Bolted Steel Tanks for Digester and Bioenergy Process

 

 

Brief introduction

Center has the most advanced glass fused to steel production technology and professional production line ,already passed ISO 9001-2000 ,and developed the enamel bolted tank enterprise standard Q/01ZT012009, which is the highest standard in China  and can meet European standards .We can produce AA grade (acid -proof and alkali -proof )enamel sheet according to customers’ different operating requirement In water and waste water treatment and biogas project, GFS tank has been widely used as various aerobic and anaerobic reactors of UASB,EGSB,SBR,BAF,USR,CSTR, and equalization tank, Clarifier, sludge holding tank, etc

 

Why choose GFS tanks

High resistance even against corrosive effluents

  1.  Easy to transport ,low fright cost
  2.  Standard green and color can be customized
  3.  Installation by a trained crew of professionals.
  4.  Short-term production and installation;
  5.  Beautiful appearance Bolted tank construction is  very conservation friendly with little disturbance to the surrounding environment.
  6.  Low capital cost :Tanks are assembled at ground level using a unique jacking system that progressively elevates  the structure to install the panels without the need for expensive cranes or staged scaffolding
  7.  For the installation of the Glass Fused to Steel tanks, the works are carried out at ground level with the use of Jack equipment. Therefore, from a Safety aspect, no work is carried out at height.

 

Comparison of various tanks

Characteristic

Cement

304 S.S.

FRP  tank

Enamel tank

Pressure standing ability

strong

normal

normal

strong

Installation period

> 35 days

>20 days

>30 days

7-10 days

installation

Complex, request big professional equipment

Professional people, work high above the ground, dangerous installation

work high above the ground, dangerous installation, have request on weather condition

Safe installation, easy, fast, do  not have requests on weather condition

removal

impossible

Possible, but high cost

impossible

Possible, low cost

Out appearance

normal

Ok,  but only one color

ok

Good looking

 

Package

To make sure of the plate’s code and quality, double checking is required before packing.The steel plates are separated wit each other by PE foam, to avoid any damage on the coating surface. And the whole pallet steels are covered with a outer film, tied by steel belt.

bigPhoto
 Mr. melody wong

Tel: 86-20-34061629
Contact to this supplier

Related Search

Find more related products in following catalogs on Hisupplier.com

Related Products

Company Info

Center Enamel Co.,Ltd [China (Mainland)]


Business Type:Manufacturer
City: Guangzhou
Province/State: Guangdong
Country/Region: China (Mainland)

You May Like:

Product (149)