Place of Origin: | Guangdong, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
Convenient Installed Fire Water Tank With Enamel Finish
Center Enamel is the largest supplier of glass fused to steel tanks (GFS Tanks) in China. With more than 20 years experience, our Fire Water Tanks are supplied for industry, commercial and municipal application. Over 1000 tanks built all over the world successfully, Center Enamel has strong research and develop ability to meet different request from our customers.
The combination of steel hardness and glass anti - corrosion provide the assurance that excellent corrosion resistance and more than 30 years service life. Under 850 degrees Celsius high temperature fusion, the glass are fused onto the surface of steel perfectly with result of durable finish.
Why GFS Fire Water Tank?
Center Enamel’s Glass fused to steel tanks are manufactured in its factory, which already pass ISO9001 - 2008 quality certification system. All the glass fused to steel sheets are enamel coated / glass fused at more than 850 degrees Celsius temperature fusion. Comparing to other tanks, like concrete tanks, welded steel tanks, GFS fire water tanks are easy to install and construct, and it takes even less than 15 days for construction.
Perfectly fusion of glass and steel, our glass fused to steel fire water tanks can resist PH range from 1 to 14, service life even more than 30 years!
Comparison with other tanks
Characteristic |
Stainless steel |
Carbon steel |
FRP |
Cement |
Rubber/resin |
GFS Fire Water Tank |
Abrasion resistance |
Normal |
Normal |
Bad |
Good |
Bad |
Good |
Corrosion resistance |
Good |
Bad |
Normal |
Bad |
Normal |
Good |
Impact resistance |
Good |
Good |
Normal |
Good |
Good |
Normal |
Insulation |
Bad |
Bad |
Good |
Good |
Good |
Good |
Easy to clean |
Good |
Normal |
Very bad |
Very bad |
Very bad |
Good |
Heating |
Allowed |
Allowed |
Not allowed |
Not allowed |
Not allowed |
Allowed |
Anti-static Property |
Bad |
Bad |
Good |
Good |
Good |
Good |
Application and Featured Projects
1. Fire Water Tank
2. Waste Water Treatment Project
3. Waste To Bio Energy Project
4. Portable and Drinking Water Storage
5. Grain and Dry Bulk Storage
1. Sewage Treatment:
2008 Beijing Olympics Games Waste Water Reconstruction and Extension Project
Project Description:
4 sets of sedimentation tanks Ø18.33x3.6mH
1 set of mud collection tank Ø4.82x3.6mH
Total volume: 5200m3
Installation: 12 person, 15 days
2. Biogas Engineering
2010 Indonesia Palm Oil Mill Effluent Treatment Biogas Plant Project
Project Description:
3 sets of Ø19.86x8.4mH
Total Volume: 7800m3
Installation: 15 person, 20 days
3. Potable and Fire Water Tank
2009 Niger Daily Use Potable and Fire Water Storage Project
Project Description
2 sets of water storage tank Ø19.86x4.8mH
Total Volume: 2750m3
Installation: 12 person, 12 days
Center Enamel Co.,Ltd [China (Mainland)]
Business Type:Manufacturer
City: Guangzhou
Province/State: Guangdong
Country/Region: China (Mainland)